![background image](http://html.mh-extra.com/html/nec/neccare-platinum-express5800-a1160/neccare-platinum-express5800-a1160_installation-manual_251387021.webp)
2-1
Section 2
Preparing the Cabinet
Familiarize yourself with the component layout of your system and prepare your cabinet
for installation.
Side access to the cabinet is required for power strip installation. If the new cabinet will
be placed between existing cabinets, perform
3.3 Install the Power Strips
first. Then
reattach the side skins and move the cabinet in place.
2.1. Review the Cabinet Configuration
Figure 2-1
shows the cabinet configuration. A four-cell system starts with cell 0 at the 6U
location. Smaller configurations are built similarly from the bottom of the cabinet upward,
starting with cell 0 at the 6U location. This figure shows cells and optional equipment
that might not be part of your order.
Содержание NECCare Platinum Express5800/A1160
Страница 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Страница 8: ......
Страница 14: ......
Страница 28: ......
Страница 36: ......
Страница 41: ...Power Cabling for 200V to 240V Systems 4 5 4 2 1 Power Strip Cabling for a System with One Cell ...
Страница 42: ...Power Cabling for 200V to 240V Systems 4 6 4 2 2 Power Strip Cabling for a System with Two Cells ...
Страница 52: ......
Страница 76: ... 456 01805 000 ...