![background image](http://html.mh-extra.com/html/nec/neccare-platinum-express5800-a1160/neccare-platinum-express5800-a1160_installation-manual_251387058.webp)
Checking
and Updating Management firmware Level and the BIOS Level
5-6
Figure 5-5 Power-Strip Power Cord
3. Turn the switch on the power strips to the on position.
5.4. Checking and Updating Management firmware Level
and the BIOS Level
Now that AC power is on, check the Management firmware levels and the BIOS levels
on each partition.
Содержание NECCare Platinum Express5800/A1160
Страница 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Страница 8: ......
Страница 14: ......
Страница 28: ......
Страница 36: ......
Страница 41: ...Power Cabling for 200V to 240V Systems 4 5 4 2 1 Power Strip Cabling for a System with One Cell ...
Страница 42: ...Power Cabling for 200V to 240V Systems 4 6 4 2 2 Power Strip Cabling for a System with Two Cells ...
Страница 52: ......
Страница 76: ... 456 01805 000 ...