4-26 Configuring Your Server
The table below shows the operation when the AC power to the server is turned off once and then
back on, in accordance with the [AC LINK] setting.
Setting of AC LINK
System status before AC power off
Stay Off
Last State
Power On
Operating Off
On
On
Aborting (DC power being off also)
Off
Off
On
Forced
shutdown
Off Off On
* Press the power switch continuously for four seconds or longer. This forcibly turns off the
power.
IMPORTANT:
To turn on the server from the UPS (Uninterruptible
Power Supply), select [Server] - [AC LINK] - [Power On].
Содержание Express5800/R120b-1
Страница 20: ...Notes on Using Your Server 1 3 3 5 inch disk model...
Страница 87: ...3 24 Setting Up Your Server This page is intentionally left blank...
Страница 264: ...6 10 Installing and Using Utilities 4 Click Parameter File Creator Parameter File Creator will appear...
Страница 268: ...6 14 Installing and Using Utilities Windows Server 2003...
Страница 296: ...7 14 Maintenance This page is intentionally left blank...
Страница 350: ...8 54 Troubleshooting When you use a remote console 6 Each tool is selected and it starts...
Страница 438: ...9 82 Upgrading Your Server This page is intentionally left blank...
Страница 450: ...C 2 IRQ This page is intentionally left blank...
Страница 474: ...D 24 Installing Windows Server 2008 R2 4 Activate Windows The Windows activation is complete...
Страница 504: ...E 28 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Страница 564: ......
Страница 566: ...H 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Страница 576: ...I 10 Accessing Power and Performance Data This page is intentionally left blank...
Страница 580: ...J 4 Product Configuration Record Table This page is intentionally left blank...