Upgrading Your Server 9-63
CABLE CONNECTION
This section describes the cable connection pattern within the server.
IDE Interface
A single IDE connector is installed on the baseboard. Two connectors are connected with cables in
the normal status. One of the connectors is connected to the CD-ROM drive normally installed. The
other connector can be connected to the IDE device, a built-in option installed on the 5.25-inch
device bay.
For the device installed on the 5.25-inch device bay, set the operation mode (MASTER/SLAVE) to
SLAVE (for the setting, see the manual coming with the device). Connect the proper cables to the
baseboard, CD-ROM drive, and option devices in the order.
CD-ROM drive
(normally installed)
The operation mode is
set to "MASTER."
IDE connector
Optional device
(IDE)
The operation mode is
set to "SLAVE."
Содержание Express5800/140Rc-4
Страница 10: ...iv This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Страница 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Страница 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Страница 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...