Setting Up Your Server 3-11
4.
Install an inner rail on one side of the server with three screws A in the direction shown in
the figure.
NOTE:
Each inner rail may be used at either of the left and right sides.
However, use the proper inner rail to each slide rail assembly from
which the rail has been removed so that the direction of the inner rail
can be fit to the slide rail assembly.
5.
Install the other inner rail on the other side of the server by steps 3 and 4 above.
6.
Install handles R and L on the front of the server with four screws B.
NOTE:
The left handle is different from the right handle in shape.
Check the shape of each handle. The handle (L) has the frame on which
the tab of the front bezel is hung.
Handle (L)
Frame on which tab
is hung
Left side of server
Handle (R)
Right side of server
Release lever
Содержание Express5800/140Rc-4
Страница 10: ...iv This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Страница 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Страница 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Страница 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...