Upgrading Your Server 9-59
Installation
Take the following steps to install the CPU.
NOTE:
To clarify the explanation, the duct of the retention may be
omitted in the following figures.
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Pull out the server from the rack.
3.
Remove the rear access cover.
4.
Remove the CPU access cover.
5.
Remove the memory board.
6.
Remove the processor board air duct.
7.
Remove the processor board.
8.
Locate the CPU socket which you are going to install CPU and remove the socket cover
from the socket.
9.
Raise the locking lever on the socket.
IMPORTANT:
Open the lever until it stops. It can be opened to
approx. 120 degrees.
Retention
OK
NG
Содержание Express5800/140Rc-4
Страница 10: ...iv This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Страница 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Страница 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Страница 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...