Upgrading Your Server 9-19
7.
While pressing the locking tabs on the both sides of the dummy cover, pull the dummy
cover out of the server.
8.
Remove the screws securing the latching rails mounted on the dummy cover.
9.
Tighten the two mounting screws coming with the server to secure a latching rail to each
side of the drive.
IMPORTANT:
Use the bottom raw screw holes on the latching rail (see figure
below).
Always use the screws coming with the server. Using longer screws
or those of different diameter may cause the device to be broken.
Содержание Express5800/140Rc-4
Страница 10: ...iv This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Страница 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Страница 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Страница 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...