Upgrading Your Server 9-67
9.
Connect the SCSI cable removed in step 8 to the disk array controller.
Route the SCSI cable through the point shown in the figure below when it is routed below
the guide rail for the PCI board.
10.
Install the removed parts.
11.
Turn on the power of the server to confirm that no error message does not appear in
POST.
If an error message appears, write down the message and see the error message listed in
Chapter 8.
12.
Start the BIOS setup utility to set "Reset Configuration Data" on the "Advanced" menu to
"Yes."
It is required to update the hardware configuration information. See Chapter 4 for details.
13.
Configure the system by using proper utilities.
See the online document stored in CD-ROM "EXPRESSBUILDER" coming with the
server or the manual coming with the disk array controller.
Содержание Express5800/140Rc-4
Страница 10: ...iv This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Страница 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Страница 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Страница 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...