2-10
Setting Up the System
4.
Adjust each slide rail to the approximate length measurement determined in
Step 3. The outer bracket adjustment screws (8) may need to be removed
and repositioned. See Figure 2-6, A. Loosely tighten the screws. Final
adjustment will be made once the slide rails are installed into the system
rack.
A
A
Figure 2-6. Adjusting the Slide rail
5.
Align one of the slide rail assemblies behind the mounting holes in the
vertical mounting rail (see Figure 2-7) located on the left side of the rack
cabinet. The tabs on the front and rear of the slide rail assembly help to align
it with the holes in the vertical-mounting rail.
6.
Install two screws that secure the front of the slide rail assembly to the front
vertical-mounting rail and tighten loosely. See Figure 2-8.
No
Yes
Figure 2-7. Installing the Slide rail Assemblies
Содержание Express5800/120Rc-2
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 2: ...xxx ...
Страница 3: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 43: ...Setting Up the System 2 15 Figure 2 13 Attaching Cables to the Cable Arm Assembly ...
Страница 52: ...2 24 Setting Up the System 2 1 1 2 Figure 2 20 Making Connections ...
Страница 76: ......
Страница 124: ...4 48 Disassembly and Reassembly A Figure 4 56 Installing the PCI I O Board Figure 4 57 Securing an PCI I O Board ...
Страница 158: ...5 22 Problem Solving ...
Страница 169: ...B Technical Specifications Server Unit ...
Страница 172: ......
Страница 173: ...C Connectors Overview External Device Connector Pinout Information ...
Страница 188: ......
Страница 193: ...xx ...
Страница 194: ... 456 01554 000 ...