
Disassembly and Reassembly 4-17
A
Figure 4-17. Installing the PCI I/O Board
18.
Exert a downward pressure on the PCI I/O board at the points shown in
Figure 4-18 until the board is seated in its connector on the system board.
Figure 4-18. Securing an PCI I/O Board
19.
Reinstall the Pentium Processor air duct removed in step 6 of these
procedures.
17.
Connect any external cables (if they are needed) to all installed option
boards.
18.
Record the processor in the equipment log.
19.
Replace the top cover.
20.
Slide the server into the system rack and secure it to the rack.
20.
Plug in the server power cord, and power on the server.
21.
Install and secure the front bezel following procedures described earlier in
this chapter.
Содержание Express5800/120Rc-2
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 2: ...xxx ...
Страница 3: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 43: ...Setting Up the System 2 15 Figure 2 13 Attaching Cables to the Cable Arm Assembly ...
Страница 52: ...2 24 Setting Up the System 2 1 1 2 Figure 2 20 Making Connections ...
Страница 76: ......
Страница 124: ...4 48 Disassembly and Reassembly A Figure 4 56 Installing the PCI I O Board Figure 4 57 Securing an PCI I O Board ...
Страница 158: ...5 22 Problem Solving ...
Страница 169: ...B Technical Specifications Server Unit ...
Страница 172: ......
Страница 173: ...C Connectors Overview External Device Connector Pinout Information ...
Страница 188: ......
Страница 193: ...xx ...
Страница 194: ... 456 01554 000 ...