
2-26
Setting Up the System
After a few seconds your system begins the internal Power-On Self Test
(POST). POST automatically checks the system board, CPU module, memory,
keyboard, and most installed peripheral devices.
!
CAUTION
Always allow POST to complete before powering down your
system.
!
CAUTION
The server management logic on your system board
monitors and logs system voltage changes. When powering
down your system you may experience a 1–5 second delay
from the time you press the push-button power on/off switch
on the front panel and your system powering down. This is
normal system operation and is required by the server
management logic.
If you have problems powering on your system, refer to
Problem Solving
in
Chapter 5 of this User’s Guide.
After you have successfully powered on your system, insert the ExpressBuilder
CD-ROM into the CD-ROM device, reboot the system and follow the screen
prompts to run ExpressBuilder.
Содержание Express5800/120Rc-2
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 2: ...xxx ...
Страница 3: ... S e r v i c e G u i d e EXPRESS5800 120Rc 2 ...
Страница 43: ...Setting Up the System 2 15 Figure 2 13 Attaching Cables to the Cable Arm Assembly ...
Страница 52: ...2 24 Setting Up the System 2 1 1 2 Figure 2 20 Making Connections ...
Страница 76: ......
Страница 124: ...4 48 Disassembly and Reassembly A Figure 4 56 Installing the PCI I O Board Figure 4 57 Securing an PCI I O Board ...
Страница 158: ...5 22 Problem Solving ...
Страница 169: ...B Technical Specifications Server Unit ...
Страница 172: ......
Страница 173: ...C Connectors Overview External Device Connector Pinout Information ...
Страница 188: ......
Страница 193: ...xx ...
Страница 194: ... 456 01554 000 ...