5-36
Maintenance of NEC Express5800/ft series
NEC Express5800/ft series maintenance can be done in two ways; one is to use NEC ESMPRO
Manager for remote maintenance and the other is to use the NEC ESMPRO Agent ft server utility
on the NEC Express5800/ft series for local maintenance.
TIPS:
The following explains how to start NEC ESMPRO Agent ft server utility installed on
NEC Express5800/ft series.
1.
Move to the location where NEC ESMPRO Agent is installed.
If the installation destination is not specified, /opt/nec/esmpro_sa is the destination.
In this description, /opt/nec/esmpro_sa is assumed as the installation destination.
2.
Move to the location where ft server utility is stored.
cd bin
3.
Start the tool.
./ESMftcutil
The maintenance functions that can be executed from NEC ESMPRO include three types, those
common to all components, those specific to particular components, and general system settings.
The maintenance functions common to all components are operated in the same way basically (the
operation procedure and typical examples of screen images are described below).
The table below lists the maintenance functions common to all components.
Start Stop
MTBF
clear
Diag-
nosis
F/W
update
Component
R L R L R L R L R L
CPU module
√
√
√
√
√
√
– – –
√
PCI module
√
√
√
√
√
√
– – – –
PCI
slot
– – – – – – – – – –
Ethernet
adapter
– – – –
√
√
– – – –
SCSI
adapter
– – – –
√
√
– – – –
SCSI
enclosure
– – – –
√
√
– – – –
SCSI
electronics
– – – –
√
√
– – – –
SCSI
slot
– – – –
√
√
– – – –
R:
Remote. Executable from remote management PC by using NEC ESMPRO
Manager
L:
Local. Executable on local server by using ft server utility
√
: Support
–: Not
support
Содержание Express 5800/320Lb-R
Страница 1: ...N8800 048E 049E NEC Express5800 320Lb 320Lb R User s Guide 1st Edition 10 2004 856 124161 901 A ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 14: ...viii Setup of Optional PCI Board 8 43 Appendix A Specifications A 1 Appendix B I O Port Address B 1 ...
Страница 17: ...1 3 Label D Label C Label B Label A Label E ...
Страница 18: ...1 4 Rack mount Model Label A Label D Label E Label C Label B ...
Страница 19: ...1 5 Label D Label C Label B Label A Label E ...
Страница 20: ...1 6 PCI CPU Modules PCI Module CPU Module Label A Label B Label A External View Internal View External View ...
Страница 21: ...1 7 Label A Internal View Label B Label B ...
Страница 36: ...1 22 This page is intentionally left blank ...
Страница 44: ...2 8 Front View inside Tower model Rack mount model ...
Страница 83: ...3 9 This page is intentionally left blank ...
Страница 84: ......
Страница 156: ...5 28 PCI Device Detailed information Allows the detailed information of a device on the PCI slot to be viewed ...
Страница 168: ...5 40 Sample screen of NEC ESMPRO Manager 2 Maintenance screen of CPU module CPU Module Maintenance ...
Страница 177: ...5 49 Not support ...
Страница 191: ...5 63 This page is intentionally left blank ...
Страница 192: ......
Страница 205: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown ...
Страница 254: ...8 12 Check the disk status to confirm that the disk is added successfully ...
Страница 273: ...8 31 Chapter 7 Troubleshooting ...
Страница 283: ...8 41 18 Use cable ties to fasten the extra length of cables Cable ties included with cabinet ...
Страница 297: ...8 55 This page is intentionally left blank ...
Страница 298: ......
Страница 300: ...A 2 This page is intentionally left blank ...