
8-23
PROCESSOR (CPU)
In addition to the standard CPU (Intel® Xeon™ Processor), you can add one CPU to make a
multi-processor system.
IMPORTANT:
The CPU is extremely sensitive to static electricity. Make sure to touch the metal frame of the
server to discharge static electricity from your body before handling the CPU. Do not touch
the CPU terminals or on-board parts with a bare hand or place the CPU directly on the desk.
For static notes, see the section "Anti-static Measures" described earlier.
Do not use the system before checking to see it works correctly.
Make sure to use the CPU authorized by NEC. Installing a third-party CPU may cause a
failure of the CPU as well as the server. Repair of the server due to failures or damage
resulted from installing such a board will be charged.
Before adding or removing CPU, power off the server and detach the CPU module.
Make sure to read "Anti-static Measures" and "Preparing Your System for Upgrade" before
starting installing or removing options.
CPU#2
(additional)
CPU#1
(standard)
Содержание Express 5800/320Lb-R
Страница 1: ...N8800 048E 049E NEC Express5800 320Lb 320Lb R User s Guide 1st Edition 10 2004 856 124161 901 A ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 14: ...viii Setup of Optional PCI Board 8 43 Appendix A Specifications A 1 Appendix B I O Port Address B 1 ...
Страница 17: ...1 3 Label D Label C Label B Label A Label E ...
Страница 18: ...1 4 Rack mount Model Label A Label D Label E Label C Label B ...
Страница 19: ...1 5 Label D Label C Label B Label A Label E ...
Страница 20: ...1 6 PCI CPU Modules PCI Module CPU Module Label A Label B Label A External View Internal View External View ...
Страница 21: ...1 7 Label A Internal View Label B Label B ...
Страница 36: ...1 22 This page is intentionally left blank ...
Страница 44: ...2 8 Front View inside Tower model Rack mount model ...
Страница 83: ...3 9 This page is intentionally left blank ...
Страница 84: ......
Страница 156: ...5 28 PCI Device Detailed information Allows the detailed information of a device on the PCI slot to be viewed ...
Страница 168: ...5 40 Sample screen of NEC ESMPRO Manager 2 Maintenance screen of CPU module CPU Module Maintenance ...
Страница 177: ...5 49 Not support ...
Страница 191: ...5 63 This page is intentionally left blank ...
Страница 192: ......
Страница 205: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown ...
Страница 254: ...8 12 Check the disk status to confirm that the disk is added successfully ...
Страница 273: ...8 31 Chapter 7 Troubleshooting ...
Страница 283: ...8 41 18 Use cable ties to fasten the extra length of cables Cable ties included with cabinet ...
Страница 297: ...8 55 This page is intentionally left blank ...
Страница 298: ......
Страница 300: ...A 2 This page is intentionally left blank ...