
8-13
CPU MODULE
Concerning the CPU module, you can add or replace the following components, or CRU
(customer-replaceable units):
CPU (processor)
DIMM (memory)
Remove the CPU module to install or remove these devices. The figures used in this section show
the tower model. The orientation is the only difference from the rack-mount model.
IMPORTANT:
Ask your sales agent to replace the CPU module and components of the CPU module.
Make sure to read "Anti-static Measures" and "Preparing Your System for Upgrade" before
installing or removing options.
To install or remove CPU or DIMM, first power off the server before removing the CPU
module. The procedures described below are for replacement of DIMMs.
Removing the module being operating may cause unexpected trouble. Use the management
software (e.g., ft server utility or NEC ESMPRO Manager) to identify the module to be
removed so that the module is removed when it is stopped, without fail
Then remove the relevant module after verifying the status LED on the CPU module.
Handle the module fixing screw with your hand, not by using any tool.
If you have replaced the module, attach an HDD ID label indicating the replaced module
number to the upper part of the fixing screw of the module.
PRECAUTIONS:
When replacing a PCI module and a CPU module, replace one module and wait until dual
configuration is established to replace the other module. If you replace the both modules
simultaneously, dual configuration of either CPU modules or PCI modules may fail. (See
Chapter 7 “Troubleshooting”.)
Содержание Express 5800/320Lb-R
Страница 1: ...N8800 048E 049E NEC Express5800 320Lb 320Lb R User s Guide 1st Edition 10 2004 856 124161 901 A ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 14: ...viii Setup of Optional PCI Board 8 43 Appendix A Specifications A 1 Appendix B I O Port Address B 1 ...
Страница 17: ...1 3 Label D Label C Label B Label A Label E ...
Страница 18: ...1 4 Rack mount Model Label A Label D Label E Label C Label B ...
Страница 19: ...1 5 Label D Label C Label B Label A Label E ...
Страница 20: ...1 6 PCI CPU Modules PCI Module CPU Module Label A Label B Label A External View Internal View External View ...
Страница 21: ...1 7 Label A Internal View Label B Label B ...
Страница 36: ...1 22 This page is intentionally left blank ...
Страница 44: ...2 8 Front View inside Tower model Rack mount model ...
Страница 83: ...3 9 This page is intentionally left blank ...
Страница 84: ......
Страница 156: ...5 28 PCI Device Detailed information Allows the detailed information of a device on the PCI slot to be viewed ...
Страница 168: ...5 40 Sample screen of NEC ESMPRO Manager 2 Maintenance screen of CPU module CPU Module Maintenance ...
Страница 177: ...5 49 Not support ...
Страница 191: ...5 63 This page is intentionally left blank ...
Страница 192: ......
Страница 205: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown ...
Страница 254: ...8 12 Check the disk status to confirm that the disk is added successfully ...
Страница 273: ...8 31 Chapter 7 Troubleshooting ...
Страница 283: ...8 41 18 Use cable ties to fasten the extra length of cables Cable ties included with cabinet ...
Страница 297: ...8 55 This page is intentionally left blank ...
Страница 298: ......
Страница 300: ...A 2 This page is intentionally left blank ...