
5-46
Procedure in the ft server utility
72.
Enable “Auto module start” and “Auto firmware update”.
See “Setup of System Operation” in this chapter for the procedure to enable.
73.
Store the image data of the firmware for update in the NEC Express5800/ft series.
Save it in the /etc directory under the name “BIOS.ROM”.
74.
On the main window of the ft server utility, select the target component.
The screen of the target component appears.
75.
Check the current state of the target component with the LEDs. If the component is
running, stop the component.
76.
Click [Update] on [Firmware].
The [Firmware Update] screen appears.
77.
Select [File Path Update] and then click [Execute].
The firmware update will be performed. After the firmware update has completed, the
target component automatically starts and the other stops.
IMPORTANT:
If “Auto firmware update” is disabled, the target component will not start and the
firmware update will not complete. In such case, perform the firmware update again
after enabling “Auto firmware update”.
78.
The other component will start automatically and the firmware will be updated
automatically.
IMPORTANT:
If “Auto module start” is disabled, the target component will not start automatically. In
such case, start the component manually. The firmware will be updated automatically.
Содержание Express 5800/320Lb-R
Страница 1: ...N8800 048E 049E NEC Express5800 320Lb 320Lb R User s Guide 1st Edition 10 2004 856 124161 901 A ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 14: ...viii Setup of Optional PCI Board 8 43 Appendix A Specifications A 1 Appendix B I O Port Address B 1 ...
Страница 17: ...1 3 Label D Label C Label B Label A Label E ...
Страница 18: ...1 4 Rack mount Model Label A Label D Label E Label C Label B ...
Страница 19: ...1 5 Label D Label C Label B Label A Label E ...
Страница 20: ...1 6 PCI CPU Modules PCI Module CPU Module Label A Label B Label A External View Internal View External View ...
Страница 21: ...1 7 Label A Internal View Label B Label B ...
Страница 36: ...1 22 This page is intentionally left blank ...
Страница 44: ...2 8 Front View inside Tower model Rack mount model ...
Страница 83: ...3 9 This page is intentionally left blank ...
Страница 84: ......
Страница 156: ...5 28 PCI Device Detailed information Allows the detailed information of a device on the PCI slot to be viewed ...
Страница 168: ...5 40 Sample screen of NEC ESMPRO Manager 2 Maintenance screen of CPU module CPU Module Maintenance ...
Страница 177: ...5 49 Not support ...
Страница 191: ...5 63 This page is intentionally left blank ...
Страница 192: ......
Страница 205: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown ...
Страница 254: ...8 12 Check the disk status to confirm that the disk is added successfully ...
Страница 273: ...8 31 Chapter 7 Troubleshooting ...
Страница 283: ...8 41 18 Use cable ties to fasten the extra length of cables Cable ties included with cabinet ...
Страница 297: ...8 55 This page is intentionally left blank ...
Страница 298: ......
Страница 300: ...A 2 This page is intentionally left blank ...