19
All rights reserved ©N1 Critical Technologies, Inc.
NE Series (20-30kVA)
User Manual
Chapter 3 Installation
Figure3-3 Appearance
Step 3 Rotate the four UPS “feet” in a counter-clockwise direction evenly until the four feet can support
the device completely. Remove the bolts connecting the UPS to the pallet. Detach the fixed
board from front and rear UPS plates, then rotate the 4 support feet clockwise, ensuring they
go all the way up into the UPS. This will put the weight of the device on the wheels. Attach
ramp in front of the UPS, aligning it with the pallet. Loosen the brakes of front wheels and roll
the UPS to the ground slowly. Use multiple persons as UPS unit is heavy. Push the UPS into
position with the expansion bolts. Lower the four support feet counter-clockwise until they
reach the floor to stabilize the unit. Lock the UPS into place with the expansion bolts and
corresponding nuts.
Figure3-4 Bottom structure