e
Maintenance 7
f
3.2 Outdoor
Unit
Evacuation for the whole system
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
56+4
)259+
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
<GI[[SV[SV
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve’s
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
5.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
6.
Disconnect the charge hose from the vacuum pump.
7.
Mount the caps of service port and 2- and 3-way
valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m.
Service manual
H11 series
Содержание MUPR-09-H11-E
Страница 1: ...Service manual MUPR H11 www mundoclima com CL20055 CL20058 R32...
Страница 16: ...Service manual H11 series MUPR 24 H11 I Specifications 7f e...
Страница 17: ...Outdoor unit wiring diagram 16022000019533 Service manual H11 series MUPR 09 12 18 H11 E Specifications 8 f e...
Страница 18: ...Service manual H11 series MUPR 24 H11 E Specifications 9 f e...
Страница 58: ...e Outdoor Unit Disassembly 3 f 1 Panel Plate X101 Service manual H11 series MUPR 09 12 H11 E 2 Dimension...
Страница 59: ...e Outdoor Unit Disassembly 4 f 2 Panel Plate X301 Service manual H11 series MUPR 18 H11 E...
Страница 60: ...e Outdoor Unit Disassembly 5 f 3 Panel Plate X401 Service manual H11 series MUPR 24 H11 E...
Страница 117: ...Service manual H11 series e f Troubleshooting 25...