6. COMMUNICATIONS
MEMORY MAP
6-35
GROUP
ADDR
(hex)
DESCRIPTION
MIN.
MAX.
STEP
VALUE
UNITS
FORMAT
CODE
FACTORY
DEFAULT
15D8
Time to Trip at 5.00 x FLA
5
999999
1
s
F10
146
15DA
Time to Trip at 5.50 x FLA
5
999999
1
s
F10
120
15DC
Time to Trip at 6.00 x FLA
5
999999
1
s
F10
100
15DE
Time to Trip at 6.50 x FLA
5
999999
1
s
F10
85
15E0
Time to Trip at 7.00 x FLA
5
999999
1
s
F10
73
15E2
Time to Trip at 7.50 x FLA
5
999999
1
s
F10
63
15E4
Time to Trip at 8.00 x FLA
5
999999
1
s
F10
56
15E6
Time to Trip at 10.0 x FLA
5
999999
1
s
F10
56
15E8
Time to Trip at 15.0 x FLA
5
999999
1
s
F10
56
15EA
Time to Trip at 20.0 x FLA
5
999999
1
s
F10
56
15EC
Reserved
...
15FF
Reserved
1600
Minimum Allowable Line Voltage
70
95
1
% Rated
F1
80
1601
Stall Current at Min Vline
200
1500
1
x FLA
F3
480
1602
Safe Stall Time at Min Vline
5
9999
1
s
F2
200
1603
Accel. Intersect at Min Vline
200
1500
1
x FLA
F3
380
1604
Stall Current at 100 % Vline
200
1500
1
x FLA
F3
600
1605
Safe Stall Time at 100 % Vline
5
9999
1
s
F2
100
1606
Accel. Intersect at 100 % Vline
200
1500
1
x FLA
F3
500
1607
Reserved
...
163F
Reserved
SHORT
1640
Short Circuit Trip
0
2
1
-
FC115
0
CIRCUIT
1641
Overreach Filter
0
1
1
-
FC103
0
TRIP
1642
Short Circuit Trip Relays
0
6
1
-
FC118
0
1643
Short Circuit Trip Pickup
20
200
1
x CT
F2
100
1644
Intentional Short Circuit Trip Delay
0
1000
10
ms
F1
0
1645
Short Circuit Trip Backup
0
1
1
-
FC103
0
1646
Short Circuit Backup Relays
0
2
1
-
FC119
0
1647
Short Circuit Trip Backup Delay
10
2000
10
ms
F1
200
1648
Reserved
...
164F
Reserved
OVERLOAD
1650
Overload Alarm
0
2
1
-
FC115
0
ALARM
1651
Overload Alarm Relays
0
6
1
-
FC113
0
1652
Overload Alarm Events
0
1
1
-
FC103
0
1653
Overload Alarm Delay
1
600
1
s
F2
0
1654
Reserved
...
165F
Reserved
MECHANICAL
1660
Mechanical Jam Trip
0
2
1
-
FC115
0
Содержание SR469
Страница 7: ......
Страница 19: ...2 INSTALLATION MECHANICAL 2 5 2 1 5 TERMINAL LOCATIONS Figure 2 11 TERMINAL LAYOUT...
Страница 21: ...2 INSTALLATION ELECTRICAL 2 7 Figure 2 12 TYPICAL WIRING DIAGRAM...
Страница 32: ...ELECTRICAL 2 INSTALLATION 2 18 2 2 14 TYPICAL 2 SPEED MOTOR WIRING...
Страница 39: ...OVERVIEW 3 SR469 OPERATION 3 6 yy SETPOINTS yy S1 SR469 SETUP...
Страница 104: ...4 SETPOINT PROGRAMMING S11 MONITORING 4 65 Figure 4 24 TRIP COIL SUPERVISION...
Страница 113: ...S12 ANALOG I O 4 SETPOINT PROGRAMMING 4 74...
Страница 244: ...8 469PC PROGRAM WAVEFORM CAPTURE 8 13 Figure 8 11 WAVEFORM CAPTURE...