![Multilin SR469 Скачать руководство пользователя страница 226](http://html1.mh-extra.com/html/multilin/sr469/sr469_instruction-manual_1854469226.webp)
HARDWARE FUNCTIONAL TESTING
7. TESTING
7-8
7.2.8
OUTPUT RELAYS
To verify the functionality of the output relays, perform the following steps:
1.
Using the setpoint:
SETPOINT S13:TESTING\TEST OUTPUT RELAYS\FORCE OPERATION OF RELAYS: R1 TRIP
select and store values as per the table below, verifying operation
Table 7-13 OUTPUT RELAYS
FORCE
OPERATION
SETPOINT
EXPECTED MEASUREMENT
4
for SHORT
ACTUAL MEASUREMENT
4
for SHORT
R1
R2
R3
R4
R5
R6
R1
R2
R3
R4
R5
R6
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
no
nc
R1 Trip
4
4
4
4
4
4
R2 Auxiliary
4
4
4
4
4
4
R3 Auxiliary
4
4
4
4
4
4
R4 Alarm
4
4
4
4
4
4
R5 Block Start
4
4
4
4
4
4
R6 Service
4
4
4
4
4
4
All Relays
4
4
4
4
4
4
No Relays
4
4
4
4
4
4
NOTE: R6 Service relay is failsafe or energized normally, operating R6 causes it to de-energize.
Содержание SR469
Страница 7: ......
Страница 19: ...2 INSTALLATION MECHANICAL 2 5 2 1 5 TERMINAL LOCATIONS Figure 2 11 TERMINAL LAYOUT...
Страница 21: ...2 INSTALLATION ELECTRICAL 2 7 Figure 2 12 TYPICAL WIRING DIAGRAM...
Страница 32: ...ELECTRICAL 2 INSTALLATION 2 18 2 2 14 TYPICAL 2 SPEED MOTOR WIRING...
Страница 39: ...OVERVIEW 3 SR469 OPERATION 3 6 yy SETPOINTS yy S1 SR469 SETUP...
Страница 104: ...4 SETPOINT PROGRAMMING S11 MONITORING 4 65 Figure 4 24 TRIP COIL SUPERVISION...
Страница 113: ...S12 ANALOG I O 4 SETPOINT PROGRAMMING 4 74...
Страница 244: ...8 469PC PROGRAM WAVEFORM CAPTURE 8 13 Figure 8 11 WAVEFORM CAPTURE...