10
ISOBUS-TC task processing
Using fields and shp data
66
V5.20170221
31302713-02-EN
1.
- Open the ISOBUS-TC application.
2.
Tap "Current task".
⇨
The "Task" screen will appear.
3.
Tap "List of connection".
⇨
You have called up the list of connections screen.
⇨
A list will appear with all of the equipment connected to the ISOBUS. The connectors
appear between the equipment.
4.
Tap the task in the top row in order to select the first implement. If you are using a ME terminal to
which a GPS receiver is connected, insert the Tractor-ECU application in the top row. If another
terminal or tractor job computer contains the geometry, you can set it.
5.
The device which is connected to the ME terminal should appear in the second line. Tap the line
with the second implement and select one from this.
6.
You now only need to select the appropriate connector between the two devices. Tap the line
between two devices and select the appropriate connector for each device.
7.
- Exit the screen to save the settings.
In simple systems, the terminal can set up the list of connections automatically. In particular, when
the ME terminal is the only unit containing the tractor geometry.
It can however still be necessary to set the list of connection manually in the following instances:
▪ If a tractor job computer (Tractor-ECU), in which the tractor geometry is saved, is mounted as an
independent job computer on the tractor. In this instance, you must decide which Tractor-ECU is
connected in the list of connections with other equipment: the application on the ME terminal or
on the tractor job computer.
▪ If the system cannot organize the ISOBUS job computer by itself. For example when more than
one implement is connected to the tractor (e.g.: slurry tanker and planter/seeder).
▪ When the connection to an ISOBUS job computer is interrupted during the start-up of a ISO-XML
task. In most cases, the list of connections will be set correctly as soon as you reconnect the
ISOBUS job computer.
▪ If this error message appears when starting the terminal: "List of connection is incomplete."
▪ When the following error message appears when starting a navigation in TRACK-Leader: "The
device data is still loading." The settings in the list of connections can eliminate this problem.
Using fields and shp data
In the "Fields" category, you can create all of the fields that you want to process. For each field, you
can enter the following properties:
▪ Field name
▪ Code (optional)
▪ Area
▪ Field boundary
▪ Guidance lines
▪ Obstacles
▪ Prescription map (ISOBUS-TC license required)
10.3