6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
218
7545652/00 EN
VACUTAP
®
VR-Ex
2. Fill on-load tap-changer with new insulating fluid using one of the two free
pipe connections of the on-load tap-changer head.
Figure 251: Pipe connections S and R
3. Take an insulating fluid sample from the oil compartment.
4. Record the temperature of the sample immediately after the sample is
taken.
5. Determine the dielectric strength and water content at a sample tempera-
ture of 20°C ± 5°C. The dielectric strength and water content must comply
with the limit values [
Section 8.3, Page 233] specified in the technical
data.
6.3.2 Bleeding on-load tap-changer head and suction pipe
6.3.2.1 Bleeding on-load tap-changer head
1. Open all forward valves and return valves in the pipe system.
Содержание VACUTAP VR-Ex
Страница 73: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 73 7545652 00 EN VACUTAP VR Ex Figure 70 VACUTAP VRS ...
Страница 74: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 74 7545652 00 EN VACUTAP VR Ex Figure 71 VACUTAP VRM VRH VRX ...
Страница 75: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 75 7545652 00 EN VACUTAP VR Ex Figure 72 VACUTAP VRM VRH VRX ...
Страница 76: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 76 7545652 00 EN VACUTAP VR Ex Figure 73 VACUTAP VRL VRH ...
Страница 77: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 77 7545652 00 EN VACUTAP VR Ex Figure 74 VACUTAP VRL VRH ...
Страница 234: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 234 7545652 00 EN VACUTAP VR Ex 9 Drawings 9 1 Dimensional drawings ...
Страница 237: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 237 7545652 00 EN VACUTAP VR Ex 9 2 On load tap changer head ...
Страница 238: ......
Страница 241: ......
Страница 242: ......
Страница 243: ......
Страница 244: ......
Страница 245: ......
Страница 246: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 246 7545652 00 EN VACUTAP VR Ex 9 3 Adjustment plans ...
Страница 254: ......
Страница 255: ......