5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
53
7545652/00 EN
VACUTAP
®
VR-Ex
5.3.1.2.3 Connecting the oil compartment to the top part of the on-load tap-
changer head
5.3.1.2.3.1 Connecting the oil compartment to the top part of the on-load tap-
changer head
NOTICE
Incorrectly lifting the on-load tap-changer will damage it!
If the connection screws of the supporting flange are used to lift the on-load
tap-changer, the screws may be damaged, which makes it impossible to
properly screw the on-load tap-changer and the on-load tap-changer head
together!
► Always lift the on-load tap-changer with the specified lifting traverse, and
never with the connection screws of the supporting flange.
You can either use lifting equipment or the special lifting device to connect
the oil compartment to the top part of the on-load tap-changer head. The
special lifting device option is described below.
1. Carefully insert lifting device into the oil compartment with claws turned in.
Figure 38: Lifting device
2.
NOTICE!
Inaccurate alignment of on-load tap-changer head to supporting
flange will damage the on-load tap-changer when it is lifted. Swing claws
of lifting device outwards, use lifting device to lift oil compartment. Ensure
that the triangular markings are aligned and that all supporting flange stud
bolts go easily through the mounting holes of the on-load tap-changer
head.
Содержание VACUTAP VR-Ex
Страница 73: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 73 7545652 00 EN VACUTAP VR Ex Figure 70 VACUTAP VRS ...
Страница 74: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 74 7545652 00 EN VACUTAP VR Ex Figure 71 VACUTAP VRM VRH VRX ...
Страница 75: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 75 7545652 00 EN VACUTAP VR Ex Figure 72 VACUTAP VRM VRH VRX ...
Страница 76: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 76 7545652 00 EN VACUTAP VR Ex Figure 73 VACUTAP VRL VRH ...
Страница 77: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 77 7545652 00 EN VACUTAP VR Ex Figure 74 VACUTAP VRL VRH ...
Страница 234: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 234 7545652 00 EN VACUTAP VR Ex 9 Drawings 9 1 Dimensional drawings ...
Страница 237: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 237 7545652 00 EN VACUTAP VR Ex 9 2 On load tap changer head ...
Страница 238: ......
Страница 241: ......
Страница 242: ......
Страница 243: ......
Страница 244: ......
Страница 245: ......
Страница 246: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 246 7545652 00 EN VACUTAP VR Ex 9 3 Adjustment plans ...
Страница 254: ......
Страница 255: ......