2. Fill on-load tap-changer with new insulating fluid using one of the two free
pipe connections of the on-load tap-changer head.
Figure 197: Pipe connections S and R
5.4.10 Performing transformer ratio test after drying
NOTICE
Damage to the on-load tap-changer!
Damage to the on-load tap-changer due to transformer ratio test being in-
correctly performed.
► Ensure that the selector / de-energized tap changer is fully immersed in
the insulating fluid and that the oil compartment of the on-load tap-
changer is completely filled with insulating fluid.
► Only switch the on-load tap-changer from one operating position to the
next via the upper gear unit. You can use a short tube (diameter 25 mm)
with screwed-in coupling bolt (diameter 12 mm) with a hand wheel or
crank for this, for example. When using a drill, do not exceed a maximum
speed of 250 rpm.
► Always check the operating position reached through the inspection win-
dow in the on-load tap-changer head cover. Never overshoot the end po-
sitions, which are indicated in the connection diagram supplied with the
delivery.
► For multiple-column applications with a shared drive, link all on-load tap-
changer heads to one another using the horizontal drive shaft part.
Содержание VACUTAP VR-Ex
Страница 73: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 73 7545652 00 EN VACUTAP VR Ex Figure 70 VACUTAP VRS ...
Страница 74: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 74 7545652 00 EN VACUTAP VR Ex Figure 71 VACUTAP VRM VRH VRX ...
Страница 75: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 75 7545652 00 EN VACUTAP VR Ex Figure 72 VACUTAP VRM VRH VRX ...
Страница 76: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 76 7545652 00 EN VACUTAP VR Ex Figure 73 VACUTAP VRL VRH ...
Страница 77: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 77 7545652 00 EN VACUTAP VR Ex Figure 74 VACUTAP VRL VRH ...
Страница 234: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 234 7545652 00 EN VACUTAP VR Ex 9 Drawings 9 1 Dimensional drawings ...
Страница 237: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 237 7545652 00 EN VACUTAP VR Ex 9 2 On load tap changer head ...
Страница 238: ......
Страница 241: ......
Страница 242: ......
Страница 243: ......
Страница 244: ......
Страница 245: ......
Страница 246: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 246 7545652 00 EN VACUTAP VR Ex 9 3 Adjustment plans ...
Страница 254: ......
Страница 255: ......