
31
TriStar MPPT-600V-TR Operator's Manual
30
Installation
Figure 3-10. Power Connections - TR Box Only
48 Volt
Battery Termination
+
+
+
-
-
-
Up to 2 Strings
A
B
B
C
D
D
E
E
F
F
H
Grounding
Block
G
Loose Leads for
Termination at a GFPD,
or cut to length, and
connected at the Controller
Solar +/- Terminals (Step G)
To Grid-tie Inverter
Solar Input
Solar Array
Inputs
48 Volt
Battery Termination
+
+
+
-
-
-
Up to 2 Strings
A
A
B
B
C
D
D
E
E
F
F
H
H
Grounding
Block
Grounding
Block
To Grid-tie Inverter
Solar Input
Solar Array
Inputs
Figure 3-11. Power Connections - with GFPD Box