Product Description and Installation Process
Television & Mantel Clearances
Flue Configuration (If less than 8m flue length is required)
Flue Configuration (If more than 8m flue length is required)
Installing the Horizontal Powerflue Wall Terminal Option
Installing the Internal Vertical Powerflue (UVP)
Installing the External Vertical Powerflue (UVP)
Installing in Accordance with Relevant Codes
Running the Powerflue Electrical Cable
Installing the Electricity and Gas to the Appliance
Removing (and Replacing) the Glass