
APPENDIX B – PROGRAMS
64
DIAGRAMS OF THE TEST PROGRAMMES
PROGRAM
BOWIE & DICK TEST
134°C - 3'00''
Pressure (bar)
0.00
1.00
2.00
2.10
-1.00
Time (min)
SHORT DRYING
PROCESS
FRACTIONATED PRE-VACUUM
PROGRAM
VACUUM TEST (VT)
-0.80 bar
Pressure (bar)
P0
0.00
1.00
Time (min)
-0.80
t1
t2 = t1+300 s
5 minutes
10 minutes
P1
P2
P3
(P2-P1) < (P0-P1)/10
t3 = t2+600 s
WAITING
LEAKAGE
(P3-P2) < 0.02 bar
End condition for
positive test result
Intermediate condition for
the continuation of the test
VACUUM
PHASE
Содержание millenium B2
Страница 1: ...Quality System certified by STEAM STERILIZER OPERATING MANUAL Ed 1 Rev 5 Date January 2008...
Страница 5: ......
Страница 93: ...APPENDIX F DIAGRAMS 88 PLUMBING DIAGRAM Air CHAMBER Recovery tank Air Main tank...
Страница 95: ...APPENDIX H NOTES PER THE OPERATOR 90 APPENDIX H NOTES PER THE OPERATOR...