- 18 -
C. INSTALLING THE ANTENNA UNIT
1) Cut the urethane sheet
④
into the following
dimensions.
A: 35 x 140 mm (2 pieces)
B: 70 x 20 mm (4 pieces)
C: 70 x 60 mm (1 piece)
D: 70 x 10 mm (1 piece)
2) Wrap the two pieces of urethane sheet A
④
around the cable of the antenna unit
②
.
3) Pass the cable of the antenna unit
②
into the
backside of the instrument panel at the bottom of
the front pillar.
4) Bind the antenna unit
②
to the roof harness
using the three pieces of urethane sheet B
④
.
Check
A
A
B
B B
B
C
D
Содержание MZ360360EX
Страница 6: ... 6 ...
Страница 7: ... 7 ...
Страница 16: ... 16 ...
Страница 17: ... 17 ...
Страница 28: ... 28 ...
Страница 29: ... 29 ...
Страница 42: ... 42 Circuit Diagram ...
Страница 43: ... 43 ...
Страница 44: ... 44 Troubleshooting P 38 step 2 ...
Страница 45: ... 45 P 38 step 2 3 ...
Страница 46: ... 46 P 41 step 3 3 ...
Страница 47: ... 47 P 51 terminal No 3 P 51 ...
Страница 48: ... 48 P 51 P 51 terminal No 13 ...
Страница 49: ... 49 P 51 terminal No 24 P 51 terminal No 18 ...
Страница 50: ... 50 ...