5
PROCEDURES AND SETTINGS BEFORE OPERATION
5
- 27
5.5 Test
5.5.6 Communication test
5.5.6
Communication test
Communication test is a test to check whether the transient transmission can be routed
correctly between the own station and specified communication target.
Note that, however, this test cannot be used during the circuit test.
The following explains the procedure for a communication test.
(1) Click the
button on the "CC-Link IE Controller Network
diagnostics result" screen of the CC IE Control utility.
(2) The "Communication test" screen is displayed.
Communication test
Click