5
PROCEDURES AND SETTINGS BEFORE OPERATION
1
OVE
R
VI
EW
2
SYS
TEM
CONFIGURA
T
ION
3
SP
ECIFI
C
A
T
IO
N
S
4
FUNCT
IONS
5
P
R
OCEDURES AND
S
E
TTINGS
BE
F
O
RE
O
PERA
T
IO
N
6
P
A
RAMETER
SETTI
NGS
7
IN
ST
A
LLI
NG
AN
D
UN
IN
S
TAL
LI
N
G
S
O
F
T
W
AR
E P
A
CK
AG
E
S
8
CC
IE Control
UT
IL
ITY
5.5 Test
5.5.5 Station-to-station test
5
- 26
(b) Setting the target station
In the network parameter of GX Works2, set the mode to Online.
*1
*1: If the CC-Link IE Controller Network board is the target station, set as follows on the "Parameter
setting" screen of the CC IE Control utility.
Network type: CC IE Control (Normal station)
Mode: Online
Station No.: Station number for the target station
(5) Starting the test
Clicking the
button on the "Parameter setting" screen of the CC IE Control
utility displays the following confirmation dialog box.
Clicking the
button executes the station-to-station test.
(6) Checking the test result
The result is displayed on Test result field of the "Board detail information" screen.
If the test completes abnormally, the cable used for the station-to-station test is faulty.
Replace the cable.
<Normal executing >
<Abnormal completion>
If the above display remains
for about 10 seconds, the result is
normal.
END
Yes