9 PROGRAMMING
9.2 Program Example
187
9
Setting procedure
Operating procedure
1.
Create a project.
[Project]
[New...]
2.
For "CPU Parameter" in "Link Direct Device Setting", set "Extended Mode (iQ-R Series Mode)".
[CPU Parameter]
[Memory/Device Setting]
[Link Direct Device Setting]
[Link Direct Device Setting]
When writing the module parameters of the RJ71GN11-T2 to the CPU module with the engineering tool, set
"Extended Mode (iQ-R Series Mode)" for "Link Direct Device Setting".
When "Q Series Compatible Mode" is set for "Link Direct Device Setting", "Write to PLC" cannot be executed.
3.
Set the master/local module in the following window.
[Navigation window]
[Parameter]
[Module Information]
Right-click
[Add New Module]
Содержание NZ2GN2B1-32D
Страница 2: ......
Страница 112: ...110 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 193: ...10 MAINTENANCE AND INSPECTION 191 10 MEMO ...
Страница 263: ...I 261 MEMO ...
Страница 267: ......