8 FUNCTIONS
8.3 CC-Link IE TSN Network Synchronous Communication Function
171
8
Setting procedure
Setting synchronization cycles
■
Calculating synchronization cycles
Calculate synchronization cycles from the formula below.
Synchronization cycle = Basic cycle
Magnification
Ex.
The following figure shows the synchronization cycle of each I/O module calculated based on the parameter of the master
station set as shown in the table below.
■
How to set synchronization cycles
Set the synchronization cycles of the CC-Link IE TSN Network synchronous communication function at the master station.
For details, refer to the following.
MELSEC iQ-R Inter-Module Synchronization Function Reference Manual
• Basic cycle is determined by a value in "Communication Period Interval Setting", which is set in the parameter of the master station.
• Magnification is determined by a value in "Multiple Period Setting" and a value in "Communication Period Setting" of each remote station, all of which are set
in the parameter of the master station.
Item
Description
Communication Period Interval Setting
250
s
Multiple Period Setting
• Normal-Speed:
4
• Low-Speed:
16
Communication Period Setting
I/O module A
Basic Period
I/O module B
Normal-Speed
I/O module C
Low-Speed
(1) Synchronization cycle of I/O module A = Basic cycle (250
s)
Magnification (Basic Period:
1) = 250
s
(2) Synchronization cycle of I/O module B = Basic cycle (250
s)
Magnification (Normal-Speed:
4) = 1ms
(3) Synchronization cycle of I/O module C = Basic cycle (250
s)
Magnification (Low-Speed:
16) = 4ms
(1)
(2)
(3)
I/O module A
I/O module B
I/O module C
Содержание NZ2GN2B1-32D
Страница 2: ......
Страница 112: ...110 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 193: ...10 MAINTENANCE AND INSPECTION 191 10 MEMO ...
Страница 263: ...I 261 MEMO ...
Страница 267: ......