–80–
130
°
C
(No. 1 compressor)
115
°
C
(No. 2 compressor)
• Td >
SV1
ON
OFF
ON for 4 minutes
ON
ON for 3 minutes
ON
ON during oil recovery operation after
continuous low-frequency compressor
operation.
—
—
—
Item
At compressor is started
Compressor stopped during cool-
ing or heating mode
After operation has been stopped
During defrosting ((*1) in Fig below)
During oil recovery operation
When low pressure (Ps) has
dropped during lower limit fre-
quency operation(15 minutes af-
ter start)
When the high pressure (Pd) is
risen up during lower limit fre-
quency operation (3 minutes after
starting)
When the discharge temperature
(Td) is risen up
Ps
2.0 kg/cm
2
G
(0.196 MPa)
Pd 24 kg/cm
2
G
(2.35 MPa) and
after 30 seconds
Pd
20 kg/cm
2
G
(1.96 MPa)
* Example of operation of SV1
Compressor
Bypass
solenoid
valve (SV1)
(4-minute)
(2-minute)
(4-minute)
(3-minute)
Start
Thermo.
OFF
Thermo.
ON
Defrost
Stop
2) Bypass solenoid valves (SV1, SV4) [Both SV1 and SV4 are on (open)]
<Variable capacity unit>
Ps < 1.0 kg/cm
2
G
(0.098 MPa)
Pd 27 kg/cm
2
G
(2.65 MPa)
ON when the high
pressure (Pd) ex-
ceeds the control
pressure limit.
SV4
ON
OFF
—
—
—
Normally ON
—
Pd
27.5 kg/cm
2
G
(2.70 MPa)
Pd 24 kg/cm
2
G
(2.35 MPa) and
after 30 seconds.
and
• Pd > 20 kg/cm
2
G
(1.96 MPa)
or
Ps < 3.5 kg/cm
2
G
(0.34 MPa)
115
°
C
(No. 1 compressor)
100
°
C
(No. 2 compressor)
Td
Содержание CITY MULTI PUHY-400YMF-B
Страница 13: ... 10 Noise filter NF DC reactor DCL Noise filter box Noise Filter Box Rear of the controller box ...
Страница 16: ... 13 FANCON board CNV CNW CNU CNFC2 ...
Страница 17: ... 14 RELAY board CN51C2 CNOUT2 CNRT2 CN52F CN52C2 CNCH ...
Страница 20: ... 17 CONT board SWU2 CNTR SWU1 CNFC1 SW3 SW2 CNS1 M NET transmission CN20 Power supply 1 N 3 L1 ...
Страница 26: ... 23 ...
Страница 50: ... 47 ...
Страница 152: ... 149 Model PUHY 400YMF B 500YMF B ...