- 279 -
[
IX
Troubleshooting ]
-6- Troubleshooting Principal Parts of BC Controller
1. Pressure sensor
Troubleshooting flow chart for pressure sensor
Check whether the pressure sensor or the
connectors of P1 and P3 are not disconnected,
not loose, or not connected wrongly.
All the compressors of the heat source units to
which the BC controller is connected are stopped.
Check P1 and P3 on the self-diagnosis
LED, and check that the detected
pressure is 0.098MPa [14psi] or less.
On the self-diagnosis monitor, measure
Heat source unit high-pressure 63HS
Heat source unit low-pressure 63LS
BC controller pressure P1 (liquid side)
and P3 (intermediate part)
Check whether the result is
63HS P1 P3 63LS
START
Repair the fault.
Fix the relation between
the refrigerant piping
and the transmission line.
Fix the relation between the
refrigerant piping and the
transmission line.
Replace the pressure sensor.
Replace the board.
Restore contact failure.
Check whether the contact of the pressure
sensor connector in trouble is not faulty.
OK?
OK?
Check that the difference between each
detected pressure is 0.098MPa [14psi] or less.
OK?
Both the board and the pressure sensor are normal.
OK?
Is Pd P1 P3 Ps?
Remove the pressure sensor connector
from the board, and check the pressure.
OK?
OK?
Check whether the refrigerant pipe and the
transmission line are connected correctly
between the heat source unit and the BC controller.
OK?
Operating at the moment?
Check whether the refrigerant pipe
and the transmission line are
connected correctly between the heat
source unit and the BC controller.
OK?
YES
Note 2
Note 1
NO
YES
YES
YES
Note 3
Note 4
NO
NO
NO
NO
YES
NO
NO
YES
YES
YES
NO
NO
YES
NO
YES
NO
NO
Replace the pressure sensor, which detects
less than 6MPa [870psi] pressure, with the
pressure sensor, which detects 6MPa [870psi]
or more pressure, check the pressure, and
check whether the detected pressure is
displayed normally.
10 minutes or longer after
the operation stops?
Pressure 0MPa [0psi]
6MPa [870psi] pressure
or more is displayed.
Short-circuit between connecter pins #2 and #3
on the circuit board, and check the pressure.
Содержание City Multi CMB-P1016NU-G
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 38: ... 29 II Restrictions ...
Страница 42: ... 33 II Restrictions ...
Страница 46: ... 37 II Restrictions ...
Страница 50: ... 41 II Restrictions ...
Страница 54: ... 45 II Restrictions ...
Страница 58: ... 49 II Restrictions ...
Страница 75: ... 66 ...
Страница 86: ... 77 III Heat Source Unit BC Controller Components 2 RELAY BOARD RELAY 4 board 3 RELAY BOARD RELAY 10 board ...
Страница 87: ... 78 ...
Страница 89: ... 80 ...
Страница 99: ... 90 ...
Страница 101: ... 92 ...
Страница 111: ... 102 ...
Страница 112: ... 103 VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 105 2 Principal Parts and Functions 109 ...
Страница 113: ... 104 ...
Страница 117: ... 108 VI Refrigerant Circuit 3 CMB P104 and P108NU GB sub TH25 TH22 LEV3a CP Solenoid valves Block Check valves Block ...
Страница 129: ... 120 ...
Страница 163: ... 154 ...
Страница 165: ... 156 ...
Страница 187: ... 178 ...
Страница 312: ... 303 X LED Monitor Display on the Heat Source Unit Board 1 How to Read the LED on the Service Monitor 305 ...
Страница 313: ... 304 ...