![MIT MIT-SCAN-T3 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/mit/mit-scan-t3/mit-scan-t3_instruction-manual_1806784022.webp)
Instruction Manual MIT-SCAN-T3
Version 02/2021
Page 20
2.6.1
Menu “Measure”
After selecting the measurement menu, first determine the
construction project (s. Fig. 17):
“Preset Measuring Sites”:
Measuring site plans set up with MIT's project management
software (s. sec. 5.4, p. 47) can be displayed and executed in
this menu. Numbers in brackets indicate how many of the total
number of measuring sites in the measuring site plan have
already been measured.
“Manual input”:
Here new projects are set up or activated and implemented (s.
sec. 3.2, p. 24).
“Measuring without input”
In this menu item, the measurement can be run directly
without any site data. Only installed reflector type has to be
chosen correctly.
Fig. 17 Menu - Measure
Construction project
selection:
“Preset measuring site”:
Projects preset at the PC
“Manual input”:
Current project or
preset new projects
“Measuring without input”
Measuring without
construction project
details