30 - 2
30.3
Maintenance and Testing Schedule
Follow the maintenance and testing schedule or local regulations to perform testing and maintenance. Make
sure to clean and disinfect the equipment before taking any tests and maintenance
The following table lists the maintenance and testing schedule:
30.4
Testing Methods and Procedures
Except the following maintenance tasks, all other test and maintenance tasks should be performed by Mindray-
qualified service personnel only.
■
Regular check, including visual inspection and power-on test
■
Printer and recorder tests
■
Battery check
If your equipment needs a safety test and performance test, contact the service personnel.
30.4.1
Performing Visual Inspection
Visually inspect the equipment before its first used every day. If you find any signs of damage, remove your
equipment from use and contact the service personnel.
Verify that the equipment meets the following requirements:
■
Environment and power supply specifications are met.
Test/Maintenance Item
Recommended Frequency
Performance Tests
Visual inspection
Every day, before first use.
Measurement module performance test and
calibration
1. If you suspect that the measurement values are incorrect.
2. Follow any repairs or replacement of relevant module.
3. Once a year for CO
2
and AG tests.
4. Once every two years for other parameter module performance
tests.
Analog output test
If you suspect that the analog output function does not work
properly.
Defibrillation synchronization test
If you suspect that the defibrillation synchronization function does
not work properly.
Nurse call test
If you suspect that the nurse call function does not work properly.
Electrical Safety Tests
Electrical safety tests
Once every two years.
Other Tests
Power-on test
Before use.
Recorder check
1. When the recorder is used for the first time.
2.Follow any repair or replacement of the recorder.
Network printer tests
1. When first installed.
2.Followany repair or replacement of the printer.
Device integration check
1. When first installed.
2. Follow any repair or replacement of the external device.
Battery check
Functionality test
1. When first installed.
2. When battery is replaced.
Performance test
Every three months or if the battery runtime reduced significantly.
Содержание ePM 10M
Страница 1: ...ePM 10M ePM 10MA ePM 10MC ePM 12M ePM 12MA ePM 12MC Patient Monitor Operator s Manual ...
Страница 2: ......
Страница 58: ...4 8 This page intentionally left blank ...
Страница 62: ...5 4 This page intentionally left blank ...
Страница 118: ...11 4 This page intentionally left blank ...
Страница 134: ...13 12 This page intentionally left blank ...
Страница 144: ...15 8 This page intentionally left blank ...
Страница 156: ...16 12 This page intentionally left blank ...
Страница 174: ...18 12 This page intentionally left blank ...
Страница 182: ...19 8 This page intentionally left blank ...
Страница 192: ...20 10 This page intentionally left blank ...
Страница 222: ...24 4 This page intentionally left blank ...
Страница 228: ...25 6 This page intentionally left blank ...
Страница 256: ...28 6 This page intentionally left blank ...
Страница 264: ...29 8 This page intentionally left blank ...
Страница 268: ...30 4 This page intentionally left blank ...
Страница 280: ...31 12 This page intentionally left blank ...
Страница 346: ...E 4 This page intentionally left blank ...
Страница 350: ...F 4 This page intentionally left blank ...
Страница 360: ...G 10 This page intentionally left blank ...
Страница 361: ...H 1 H Declaration of Conformity ...
Страница 362: ...H 2 This page intentionally left blank ...
Страница 363: ......
Страница 364: ...P N 046 012607 00 6 0 ...