6 - 1
6.0
Periodic Maintenance
6.1
Maintenance Schedule
The following is a list of activities required for periodic maintenance of the
Anesthesia System. Physical inspection, replacement of consumables and performance
checks should be periodically performed per the schedule listed below. Certain calibration
adjustments are required only after replacing one or both of the active devices. The
manufacturer is not responsible for component failure or loss resulting from the use of stated
consumables beyond their recommended replacement interval. These are noted in the
Periodic Maintenance Schedule (See section 6.3).
6.2
Periodic Maintenance Consumable Parts Kits
Consumable parts are available in the PM kits listed below.
• AS3000, 12-Month PM Kit: 0040-00-0446
• AS3000, 36-Month PM Kit: 0040-00-0445
Parts must be replaced at periodic intervals according to the schedule.
Содержание Datascope AS 3000
Страница 2: ...AS Datascope Anesthesia Delivery System Service Manual...
Страница 9: ...Table of Contents vi 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 13: ...Introduction Notes x 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 127: ...Calibration Procedures Calibration 5 14 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 178: ...AS3000 Service Manual 0070 10 0683 7 3 Warranty Manufacturer s Responsibility This page intentionally left blank...
Страница 179: ...0070 10 0683 Rev K August 8 2014...