Periodic Maintenance Schedule of Service Activities
Periodic Maintenance
6 - 2
6.3
Periodic Maintenance Schedule of Service Activities
6.4
Visual Inspection Checklist
1.
Verify that the
has no physical damage that would prevent operation.
2.
Verify that the breathing circuit and CO
2
absorbent are present.
3.
Verify that the vaporizers are filled but not overfilled.
4.
Verify that the Preoperative Checkout List is attached.
5.
Verify that the tank wrench is attached. (0367-00-0080)
6.
Verify that the waste gas scavenger hose to the APL Valve (0004-00-0095) is not
damaged. Drain any moisture.
7.
Verify that the O
2
, N
2
O, AIR, VAC and EVAC Supply Hoses (as applicable) are not
damaged.
8.
Verify that the AC line cord is not frayed or damaged.
REQUIRED ACTION
AFTER
EACH
SERVICE
EVERY
12
MONTHS
EVERY
36
MONTHS
ADDITIONAL
INFORMATION
Check list before surgery
X
X
Visual Inspection Checklist
X
X
Replace of Consumable Parts
X
X
Battery Maintenance and
Replacement
X
Functional Tests
X
X
Preoperative Checklist
X
X
X
O
2
Sensor Calibration: 21%
X
User to calibrate every 3
days. Service to
calibrate after initial
installation, and after
replacing the O
2
sensor.
O
2
Sensor Calibration: 100%
X
Service to calibrate
after initial installation,
and after replacing the
O
2
sensor.
Содержание Datascope AS 3000
Страница 2: ...AS Datascope Anesthesia Delivery System Service Manual...
Страница 9: ...Table of Contents vi 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 13: ...Introduction Notes x 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 127: ...Calibration Procedures Calibration 5 14 0070 10 0683 AS3000 Service Manual This page intentionally left blank...
Страница 178: ...AS3000 Service Manual 0070 10 0683 7 3 Warranty Manufacturer s Responsibility This page intentionally left blank...
Страница 179: ...0070 10 0683 Rev K August 8 2014...