.
A complete Parts List is available at www.MillerWelds.com
OM-254915 Page 20
5-9. Installing Gas Supply
255 368-A
Tools Needed:
1-1/8, 5/8 in.
1
2
3
4
5
7
Rear Panel
6
Obtain gas cylinder and chain to
running gear, wall, or other
stationary support so cylinder
cannot fall and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of
valve, and open valve slightly. Gas
flow blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Regulator/Flowmeter Gas
Hose Connection
6
Welding Power Source Gas
Hose Connection
Connect supplied gas hose
between regulator/flowmeter gas
hose connection, and fitting on
rear of welding power source.
7
Flow Adjust
Typical flow rate is 30 to 35 cfh
(cubic feet per hour). Check wire
manufacturer’s recommended
flow rate.
Argon Gas