JETVARNISH 3DS
User Manual
- 60 -
8.1.5
Blowing holes
[15] Blowing holes
All blowing holes [15] can be opened and closed with a 3mm Allen screwdriver. Each hole is instead
three holes which can be adjusted.
OPEN
CLOSE
All blowing holes [15] outside the substrate pile have to be closed. In order to test the air flow. the
substrate pile has to be in the upper position then use the Pump button [5]. Only the first substrate has
to be separated.
[15]
Содержание JETVARNISH 3DS
Страница 1: ...Version 6 0 06 06 2017 User Manual JETVARNISH 3DS EN Original instructions ...
Страница 129: ...JETVARNISH 3DS 11 Working method with the JETVARNISH 3DS User Manual 129 Printing direction Printing preview ...
Страница 167: ...JETVARNISH 3DS 14 Appendix User Manual 167 14 2 3DS Hub Manager tree view ...
Страница 168: ...JETVARNISH 3DS 14 Appendix User Manual 168 2 1 ...
Страница 169: ...JETVARNISH 3DS 14 Appendix User Manual 169 1 5 3 ...
Страница 170: ...JETVARNISH 3DS 14 Appendix User Manual 170 2 7 6 ...
Страница 171: ...JETVARNISH 3DS 14 Appendix User Manual 171 3 5 ...
Страница 172: ...JETVARNISH 3DS 14 Appendix User Manual 172 See Print ON See Print ON See Print ON 6 9 ...
Страница 173: ...JETVARNISH 3DS 14 Appendix User Manual 173 7 8 ...
Страница 174: ...JETVARNISH 3DS 14 Appendix User Manual 174 8 ...
Страница 175: ...JETVARNISH 3DS 14 Appendix User Manual 175 9 ...
Страница 176: ...JETVARNISH 3DS 14 Appendix User Manual 176 end ...