![MG Energy Systems MGRS12S4P176 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/mg-energy-systems/mgrs12s4p176/mgrs12s4p176_manual_1782743038.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
3.
Lock the connector by rotating the locking nut clockwise. Hand-tightened will be sufficient,
do not use tooling to tighten.
4.
Connectors in place.
8.5
Exhaust connection
The installation of the exhaust systems depend on the specific requirements for the exhaust system
and the used materials.
In general it is important that manufacturer instructions are followed when installing a ducting
system. Make sure that seals are placed in the correct positions and the surface as well as the seal
are pretreated as described by the ducting system manufacturer.
Depending on the required certification, it might be necessary to test the ducting system for
approval, e.g. pressure test the ducting system for leakage.