![MG Energy Systems MGRS12S4P176 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/mg-energy-systems/mgrs12s4p176/mgrs12s4p176_manual_1782743024.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
7
INTEGRATION
This section describes the requirements for integration of the battery module.
7.1
Risk assessment
Integration of a battery system requires in any case an assessment of the risks. Depending on the
application, specific rules might apply. A safety datasheet summary is available upon request.
Please contact MG Energy Systems for support and suppling the necessary documentation for basic
risk assessment.
7.2
Battery rack
It is recommended to mount the battery modules in a rack secured with all four mounting brackets.
Different parameters need to be taken into account when designing the battery rack:
Weight of the battery modules;
Shock and impact requirements;
Battery module spacing;
Fluid cooling and exhaust pipes.
Depending on the battery module configuration and space available in the vessel, different physical
setups can be created.
Figure 9 - Battery arrangement examples