5.6 RFC 2544. Performing analysis
37
5.6.4
Back-to-back. Test results
•
Table
Figure 5.26. Test results
For each of the specified frame sizes, the table shows period of time during
which the tested equipment is coping with peak load.
If this time is not detected, the
error messages
are shown in the test stage
column and dashes appear in the
Time, s
column.
If you press
button (
Frames
), the
Count
column will be shown instead
Time, s
column.
•
Graph
Figure 5.27. Test results: graph
On the diagram, for each of the specified frame sizes a vertical bar shows
measured value of the time during which the tested equipment was coping
with peak load.
The count of frames that are transmitted during the test is displayed on
the diagram vertical bars.
Bercut-ET. Operations manual
Содержание Bercut-ET
Страница 1: ...Ethernet Gigabit Ethernet Tester Analyzer Bercut ET Operations manual Version 1 1 0 2009 Metrotek ...
Страница 6: ...6 Bercut ET Operations manual ...
Страница 8: ...8 Bercut ET Operations manual ...
Страница 10: ...10 Bercut ET Operations manual ...
Страница 12: ...12 Bercut ET Operations manual ...
Страница 18: ...18 Bercut ET Operations manual ...
Страница 65: ...5 12 Testing TCP IP 65 Figure 5 68 Response example Bercut ET Operations manual ...
Страница 96: ...96 Bercut ET Operations manual ...
Страница 102: ...102 Bercut ET Operations manual ...
Страница 114: ...114 Bercut ET Operations manual ...