Setting-up procedures
1. Get the tester from the box and make the external inspection.
2. Keep the tester in normal environmental conditions for at least 2 hours
(if the tester has been previously kept in conditions distinct from nor-
mal).
3. Plug-in the power supply unit to the electric network (if you use mains
voltage 110–240 V with the 50–60 Hz frequency).
4. Switch on the tester.
Bercut-ET. Operations manual
Содержание Bercut-ET
Страница 1: ...Ethernet Gigabit Ethernet Tester Analyzer Bercut ET Operations manual Version 1 1 0 2009 Metrotek ...
Страница 6: ...6 Bercut ET Operations manual ...
Страница 8: ...8 Bercut ET Operations manual ...
Страница 10: ...10 Bercut ET Operations manual ...
Страница 12: ...12 Bercut ET Operations manual ...
Страница 18: ...18 Bercut ET Operations manual ...
Страница 65: ...5 12 Testing TCP IP 65 Figure 5 68 Response example Bercut ET Operations manual ...
Страница 96: ...96 Bercut ET Operations manual ...
Страница 102: ...102 Bercut ET Operations manual ...
Страница 114: ...114 Bercut ET Operations manual ...