![Metrohm Titrino 719 S Скачать руководство пользователя страница 142](http://html1.mh-extra.com/html/metrohm/titrino-719-s/titrino-719-s_instructions-for-use-manual_1779645142.webp)
6.4. Validation / GLP
719 S Titrino
138
6.4 Validation / GLP
GLP (Good Laboratory Practice) requires the periodic validation of the analytical instru-
ments. The reproducibility and accuracy of the instruments are checked according to
standard operating procedures.
Guidelines for the testing regulations (SOP, Standard Operating Procedure) are given in
the following Metrohm Application Bulletin:
No. 252: Validation of Metrohm Titrators (potentiometric) according to GLP/ISO 9001.
Contact your Metrohm agency for support with the validation of your Titrino. There you get
a validation documentation, which helps you to perform the installation qualification (IQ)
and the operational qualification (OQ).
Содержание Titrino 719 S
Страница 2: ......
Страница 6: ...1 2 Controls and parts 719 S Titrino 2 1 2 Controls and parts Front view of instrument...
Страница 8: ...1 2 Controls and parts 719 S Titrino 4 Rear view of instrument...
Страница 58: ......
Страница 106: ......
Страница 135: ...6 2 Pin assignment of the Remote socket 719 S Titrino 131 6 2 1 Lines of the Remote socket during the titration...