Assembly manual FS2 EI60/120 Version 11, jan.. 2021
-
Drill Ø10x160 holes in alignment with the shaft bracket holes.
-
Then proceed as described on page 12.
-
For the ceiling-mounted installation method, embed the threaded rods (not unlike chemical anchors) in
the ceiling openings (in the middle of the shaft box) and use these fasteners to attach the square tubes.
-
Roll up the curtain and install 20 mm thick Promat fire-proof panels on the shaft box curtain extension
end see previous image.
Corridor-closure installation of the guide rails
-
Align the guide rails flush with the shaft box edge. Use the channel bar holes to drill Ø8 holes for the door
frame anchors.
Shaft box promat lining
Shaft box edge line
Image Installation of Promat fire-proof panels in the back of the shaft box
Shaft box edge line
Ø8 mm door frame anchor
80
m
m
10
0mm
Image Installation of the guide rails