2.4 Electrical Connections
The E-BAM has a set of weatherproof connectors on the bottom of the unit. These connectors
provide the connections for the power supply, external sensors, and communications.
The E-BAM chassis ground lug should be connected to an earth ground whenever possible, to
reduce electrical noise in the unit.
Figure 2-5 E-BAM Connectors
2.5 Power-up and Automatic Operation
The E-BAM is designed to turn on automatically when power is applied. It will provide options to
start immediately or enter the setup menus. If START NOW is selected, ensure shipping device is
removed. Choosing setup will present several setup menus for verification. These are described in
section 2.6.
Note: If no user activity is detected for several minutes after power-up, the E-BAM will automatically
begin sampling based on the existing setup options and settings, as long as filter tape is installed,
and no hardware or voltage failures are detected. This makes it possible to fully configure and
calibrate the unit in the lab, then simply deploy it to the field and power it up with no further actions
required.
Always remove the shipping device before allowing the monitor to self-start.