![Meler Micron PUR LC Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/meler/micron-pur-lc/micron-pur-lc_instruction-manual_1767109025.webp)
INSTALLATION
3-5
MA-5184-ENG
PUR LC/MC ADHESIVE MELTER
Open the door of the electrical cabinet to its maximum position. Pass the
power cable (max. Ø14.5mm) through the Pg16 grommet and fix it taking care
that the cable is perfectly secured.
Connect each wire in the power cord to its corresponding place on the power
intake connector on the power card.
Consumption values concerning each equipment can be found in the
characteristics plate.
Pneumatic connection
If a pneumatically controlled by-pass pressure control valve is installed, the
equipment must have a compressed air supply.
Before connecting the pneumatic power to the melter, make sure the pressure
regulator is completely closed. To do this, turn the regulator handle located on
the equipment base next to the pressure gauge counterclockwise as far as it
will go.
Connect the plant air supply (max. 6 bar) to the melter intake using flexible
tubing with an outside diameter of 6 mm. The equipment is provided with a
quick coupling for this purpose.
Once the pump operation has been checked, you may adjust the pressure to
the operational value you wish.
In the pressure gauge can be found pneumatic and hydraulic pressure values,
the relation between both are 1:13.
Warning:
A 6 bar on the grid, the maximum pressure on the hydraulic circuit
reaches 80 bar. There is a risk of burns or particle projection. Use thermal
protective gear and goggles.
Attention:
Never exceed 6 bars of pneumatic pressure. This can cause serious
equipment damage. Risk of high-speed projection of particles that can cause
serious injuries
Ø6mm
L N PE L1 L2 L3 N PE
1/N ~ 230V 50/60Hz + PE 3/N ~ 400V 50/60Hz + PE
P
Содержание Micron PUR LC
Страница 1: ...ADHESIVE MELTER MICRON PUR LC MC INSTRUCTIONS MANUAL MA 5184 GBR 010920 GLUING SOLUTIONS ...
Страница 20: ...This page is intentionally left blank MELER GLUING SOLUTIONS 2 8 INTRODUCTION ...
Страница 34: ...MELER GLUING SOLUTIONS INSTALLATION 3 14 This page is intentionally left blank ...
Страница 49: ...MELTER OPERATION 4 15 MA 5184 ENG MICRON PUR LC MC ADHESIVE MELTER This page is intentionally left blank ...
Страница 84: ...MELER GLUING SOLUTIONS 5 10 MAINTENANCE Esta página no contiene texto ...
Страница 90: ...MELER GLUING SOLUTIONS 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 94: ...MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST This page is intentionally left blank ...