5.2 Requirements at the place of installation........................................... 28
5.3 Preparatory work............................................................................... 29
5.4 Installation in the pipe system........................................................... 33
5.5 Initial startup...................................................................................... 37
5.6 Electrical connection.......................................................................... 38
5.6.1 Switch contact SG-30 with connector in compliance with
EN175301-803............................................................................... 39
5.6.2 Switch contact SG-30 with plug connector M12x1......................... 40
5.6.3 Switch contact SG-30 with cable.................................................... 41
5.6.4 Degree of protection (IP-Code)...................................................... 42
5.7 Grounding the device........................................................................ 42
5.8 Plug connection................................................................................. 43
5.9 Contact protection measures............................................................. 45
..................................................................................................
6.1 Setting the switch point...................................................................... 47
6.2 Checking the flow.............................................................................. 49
.......................................................................................
7.1 Safety................................................................................................ 51
7.2 Troubleshooting guide....................................................................... 53
.............................................................................................
8.1 Safety................................................................................................ 55
8.2 Maintenance plan.............................................................................. 55
8.3 Removal from the pipe system.......................................................... 56
8.4 Disassembly...................................................................................... 58
8.5 Maintenance...................................................................................... 61
8.5.1 Cleaning......................................................................................... 62
8.5.2 Parts replacement.......................................................................... 63
8.5.3 Assembly........................................................................................ 63
8.5.4 Switch contact replacement............................................................ 70
8.6 Measures to be taken after maintenance work.................................. 72
......................................................................
Table of contents
03.09.2018
DWG Module BASICS Flow Monitor
5