5.5 Initial startup
The following steps must be taken
before initial startup and any subse-
quent startup (e.g. after removal and
installation during maintenance).
1.
WARNING!
Ensure that the plant is
operating vibration-free.
Vibrations could destroy
the device. This may
result in serious injury to
the user.
2.
WARNING!
Ensure that the medium
is flowing continuously.
Pulse-like staggered
loads could destroy the
device. This may result in
serious injury to the user.
3.
NOTICE!
Completely fill the pipe-
lines. Partial filling(s) may
result in malfunctions
and damage to the
device.
4.
NOTICE!
Vent the pipeline. If there
are air pockets in the line
during the measurement,
this could result in
damage to the device
caused by hydraulic
shock. This may cause
malfunctions.
5.
NOTICE!
Ensure that the plant is
operating without cavita-
tion. Cavitation may
result in malfunctions
and damage to the
device.
Installation und initial startup
Initial startup
03.09.2018
DWG Module BASICS Flow Monitor
37