Fig. 40: Remove the inner section
5.
Carefully remove the inner sec-
tion (Fig. 40/1) of the device
(sight glass, slot nozzle and
float) as a unit together with the
process connection (inlet)
(Fig. 40/2) from the device
housing
6.
Rotate the inner section 180
°
and remove the process con-
nection (inlet)
7.
Slightly tilt the sight glass with
slot nozzle and remove the float
Fig. 41: Remove slot nozzle
8.
Using the alignment tool, push
the slot nozzle out of the sight
glass until it can be pulled out by
hand (Fig. 41)
9.
If necessary, remove the O-rings
from the individual parts
O-ring replacement
It is recommended that the O-
rings be replaced during main-
tenance.
8.5 Maintenance
Maintenance
Maintenance
03.09.2018
DWG Module BASICS Flow Monitor
61